Open pasture
Define grazing areas, terrain and where location updates are actually needed. Identify areas with weak connectivity before choosing a device.
01 / GPSThe JSC-805 solar GPS cattle collar helps ranchers locate cattle, review grazing movements and receive boundary and device-status alerts. With a 20,000mAh battery, solar-assisted charging and an IP68-rated enclosure, it is designed for outdoor livestock tracking. Choose a 4G or LoRaWAN configuration according to local network coverage and ranch infrastructure. Web and mobile management, API integration and OEM/ODM customization are available according to the selected solution.
Journal / 01A location fix is only the beginning. Understand how that position reaches your screen, from pasture to open water.
Read articleA useful customization project starts with the problem, not the enclosure. Bring the operating conditions into the first conversation.
Read articleA practical approach to your GPS project.
Explore vehicle, pet, personal, livestock and marine tracking in one place. Start with your setting and select the product direction that fits your application.
ProductsConsider the device, connectivity and platform as one project. Put data access, integration requirements and recurring costs into the discussion from the start.
Read articleBring your branding, enclosure, firmware or integration requirements into a structured OEM conversation. Scope, feasibility and minimum quantities are agreed for the project.
Plan a custom solutionUse a sample or pilot to evaluate coverage, installation and alerts in the intended environment before planning a wider deployment.
SolutionsGPS receives positioning signals. Sending that position to an app requires a separate connection, such as cellular, LoRaWAN or satellite, depending on the device.
Cellular service depends on local coverage. Offshore use may require satellite communication; GPS alone cannot send a location ashore.
Reporting interval, signal strength, temperature and battery capacity all matter. Ask for measurements under your actual usage conditions.
Prepare your target market, connectivity, enclosure, quantity and integration requirements. Feasibility, minimum order and certification need project-specific confirmation.